Lachlan Star (ASX: LSA) has announced initial results from its diamond drilling program at the Basin Creek Prospect in New South Wales. The program successfully intersected semi-massive copper sulphide mineralisation in two of the six drill holes. Assays are expected in 2-6 weeks to provide further analysis.
Lachlan Star (ASX:LSA) announced successful results from its initial diamond drilling program at the Basin Creek Prospect, part of the Junee Project, revealing a copper-rich system. The program confirmed the continuity and potential of copper sulphide mineralisation, with key intersection of chalcopyrite in two drill holes. Assays are expected soon, which will provide detailed analysis of the mineralisation. The company plans further exploration to determine the project's economic feasibility, aligning with its strategy to develop significant copper resources in the Lachlan Fold Belt.
We are optimistic about the copper sulphide mineralisation observed and the confirmation of a north-plunging copper-rich system at Basin Creek. We eagerly await the assay results to better understand the mineralisation’s shoot geometry.